‹ Low Voltage Switchboards

MDmax-ST 4500 · MDrail E

ABB-authorised MDmax ST and MDrail-E ranges, with UL certificates

ABB MDmax ST · ABB MDrail-E · UL certificates

Hunan Zhenxiang Electric Co., Ltd. holds an ABB Licensed Panel Builder certificate for MDmax ST Low Voltage Switchgear and an ABB partner certificate for MDrail-E power distribution and control boxes/cabinets, both valid from 1 January to 31 December 2026. UL has separately issued Certificates of Compliance covering specific models, listed below. ABB authorisation does not by itself provide UL certification, and each UL certificate covers only the models named on it.

Request a quotation Certificates
MDmax-ST 4500 · MDrail E ABB-authorised MDmax ST and MDrail-E ranges, with UL certificates
Official ABB product imagery, shown as representative illustrations. These are not photographs of equipment manufactured or delivered by Zhenxiang Electric.

Tested and certified

Type-tested to the standards listed below.

Built for

Projects specifying UL 891, UL 1008 or UL 508A equipment.

Standards

UL 891, UL 1008, UL 508A.

Technical data

ParameterValue
ABB MDmax STLicensed Panel Builder, MDmax ST Low Voltage Switchgear, certificate C2026-1059349-MDmax ST, valid 1 Jan – 31 Dec 2026
ABB MDrail-EPartner certificate for MDrail-E power distribution and control box/cabinet, certificate C2026-1059349-MDrail-E, valid 1 Jan – 31 Dec 2026
UL 891, MDmax-ST 4500UL Certificate of Compliance UL-US-2580957-0 (US) and UL-CA-2559360-0 (Canada, CSA C22.2 No. 244); model MDmax-ST 4500 only
UL 891, MDrail EUL Certificate of Compliance UL-US-2580986-0; models MDrail E 40, 50, 80, 175, 350 and 600
UL 1008, MDrail-E-700UL Certificate of Compliance UL-US-2578922-0; transfer switches, model MDrail-E-700
UL 508AUL Certificate of Compliance UL-US-2587000-0; industrial control panels
Scope noteABB authorisation and UL certification are separate. Each certificate covers only the models it names.

Standards

  • UL 891
  • UL 1008
  • UL 508A

Applications

  • Projects specifying UL 891, UL 1008 or UL 508A equipment

Production process

From enquiry to commissioning

  1. Enquiry and analysisSend a single-line diagram, load list or panel schedule. An engineer confirms voltage, short-circuit level, forms of separation and applicable standards within 24 hours.
  2. Proposal and drawingsBudgetary quotation in five working days, then general-arrangement drawings, busbar sizing and a bill of materials for approval.
  3. Order and engineeringApproved drawings release procurement of Schneider, ABB or specified components and sheet-metal programming.
  4. Fabrication and assemblyLaser cutting, CNC bending, powder coating, busbar processing, primary assembly and secondary wiring in Shaoshan.
  5. Factory acceptance testDielectric, loop-resistance, insulation, earth-continuity, IP and current-injection tests; customers and consultants welcome to witness.
  6. Delivery and after-salesExport packing, sea or air freight, commissioning support and a 7×24 service line with Schneider-trained engineers.

Quote this product

Send the single-line diagram, short-circuit level and panel schedule; a budgetary quotation follows within five working days.

Request a quotation