‹ Products

Medium Voltage Switchgear

12 kV to 40.5 kV metal-clad switchgear, ring main units, outdoor switching stations, vacuum breakers and MV capacitor banks, type-tested at XIHARI and Hunan CEPRI.

Product family

7 product families

Selection guide

Which board is used where?

Selection depends on where the supply comes from, the current to be carried, the site conditions and whether the installation can be interrupted for maintenance. Final values follow the single-line diagram, selectivity study and short-circuit calculation.

FamilyLocation and roleTypical ratingKey equipment
MVnexData centre and industrial intakes to Schneider specification12 / 24 kV; ≤ 4000 A; 40 kAHVX sealed-pole breaker, CE, Schneider authorisation
KYN28-1212 kV substations, incomer, feeder and coupler630–4000 A; 16–50 kAWithdrawable VS1 breaker truck, XIHARI reports
KYN61-40.535 kV-class substations, storage and collector stations1250–2500 A; 31.5 kAZN85 / HVX40 / VD4 trucks
Ring main unitsDistribution loops, industrial estates, data-hall rings630 A; 20–25 kASF6, vacuum, eco-gas or solid-insulated
Outdoor switching stationSectionalising on distribution networks630 A; 25 kA 4 sStainless double-wall, up to 8 branches
TBBZ-12 capacitor bank6 / 10 kV reactive compensationPF > 0.9Vacuum-contactor switching, per-group protection

Design principles

Standards and design principles

01

IEC 62271-200 type tests

Dielectric, temperature-rise, short-time and internal-arc tests at XIHARI and Hunan CEPRI on every switchgear series.

02

Insulation medium

Air-insulated metal-clad, SF6 or vacuum ring main units, and non-SF6 eco-gas and solid-insulated options.

03

Breaker technology

Vacuum interrupters throughout: VS1, ZN85, HVX and outdoor ZW32 / ZW20.

04

Protection and control

Microprocessor relays, four-remote telemetry and FTU-ready ring main units.

Production process

From enquiry to commissioning

Design, production and testing sit under one roof, so responsibility stays at one point from the first drawing to site support.

  1. Enquiry and analysisSend a single-line diagram, load list or panel schedule. An engineer confirms voltage, short-circuit level, forms of separation and applicable standards within 24 hours.
  2. Proposal and drawingsBudgetary quotation in five working days, then general-arrangement drawings, busbar sizing and a bill of materials for approval.
  3. Order and engineeringApproved drawings release procurement of Schneider, ABB or specified components and sheet-metal programming.
  4. Fabrication and assemblyLaser cutting, CNC bending, powder coating, busbar processing, primary assembly and secondary wiring in Shaoshan.
  5. Factory acceptance testDielectric, loop-resistance, insulation, earth-continuity, IP and current-injection tests; customers and consultants welcome to witness.
  6. Delivery and after-salesExport packing, sea or air freight, commissioning support and a 7×24 service line with Schneider-trained engineers.

Let's confirm the right board for your project

Send a single-line diagram, load list or a plain list of requirements. Our engineers set the board type, form of separation and ratings with you.

Request a proposal