Zhenxiang Electric switchboards

Schneider Electric and ABB authorised

Power Distribution & Switchgear Solutions

Zhenxiang Electric engineers and builds low- and medium-voltage switchgear under Schneider Electric and ABB authorisations and IEC type tests, and delivers complete electrical packages for data centres, industry and infrastructure worldwide.

LV · MV switchgearIEC 61439 · IEC 62271BlokSeT · PrismaSeTMDmax ST · MDrail-EUL certificatesCE · TÜV Rheinland
175Data-centre contracts since 2023
6Schneider Electric and ABB authorisations
10+Export countries on four continents
30 daysStandard delivery for 100 panels

Official partnerships

Technology Partners and Authorisations

Schneider Electric (China) Co., Ltd. has authorised Zhenxiang as a Technology and Business Partner for BlokSeT, PrismaSeT, Prisma E and MVnex. ABB (China) Limited, Shanghai Branch has issued Zhenxiang a Licensed Panel Builder certificate for MDmax ST and a partner certificate for MDrail-E. Each authorisation has its own scope and dates, and is separate from Zhenxiang's own product certificates.

BlokSeT · LV to 7000 APrismaSeT · LVPrisma E · DistributionMVnex · 12 / 24 kVSchneider Registered Power Services PartnerABB MDmax ST · Licensed Panel BuilderABB MDrail-E · Partner

Authorisation details

The power path

From the grid to the server rack, one manufacturer

Every stage of distribution is engineered and built by Zhenxiang, so the package is coordinated once and tested together.

Manufacturing

Manufacturing for your project

In-house fabrication, assembly and testing to meet your project requirements.

In-house fabrication

In-house fabrication

Enclosures are cut on laser-cutting and CNC punching lines, formed on CNC and robotic press brakes, and finished with electrostatic powder coating, all in-house.

Copper busbar processed in-house

Copper busbar processed in-house

Busbar is punched, sheared and bent on CNC machines and a three-station processing centre. The same shop supplies bus bridge from 630 A to 5000 A.

Factory testing before delivery

Factory testing before delivery

Routine tests include dielectric withstand, loop resistance, insulation resistance, earth continuity and IP checks, with current injection on 1500 A and 2000 A benches for main switchboards. Customers and consultants are welcome to witness the factory acceptance test.

Delivery from approved drawings

100
panels
30 days
150
panels
35 days
200
panels
40 days
250
panels
45 days
300
panels
50 days
350
panels
55 days
400
panels
60 days

Urgent orders: 50 panels in 15 days.

Quality assurance

Certifications and Compliance Documents

Explore our ISO management system certificates, CE conformity documentation, UL certification documents and CB Test Certificates, together with relevant test reports.

Each document applies to the management system or product scope identified within it. Copies are available on request.

ISO 9001 certificate ISO 9001 Quality management
ISO 14001 certificate ISO 14001 Environmental
ISO 45001 certificate ISO 45001 Health and safety
CE certificate CE TÜV Rheinland, LVD 2014/35/EU
UL 891 certificate UL 891 ABB MDmax-ST 4500 and MDrail E models
UL 1008 certificate UL 1008 ABB MDrail-E-700 transfer switches
UL 508A certificate UL 508A Industrial control panels
IECEE CB certificate IECEE CB MVnex-12 / MVnex-24, IEC 62271-200

All certifications and type tests

Global delivery

From Hunan to worldwide projects

Type-tested to IEC, certified CE and holding UL Certificates of Compliance for selected ranges, Zhenxiang switchgear has been delivered to ten countries on four continents.

South-East Asia Europe South Asia Africa North America China
24 hEnquiry response
5 daysBudgetary quotation
Sea · AirExport packing and freight
7×24Service line
NORTH AMERICAEUROPEAFRICASOUTH ASIASOUTH-EAST ASIAHUNAN

Questions engineers ask

Frequently asked questions

Which standards are Zhenxiang switchgear built and tested to?
Medium-voltage switchgear is designed to IEC 62271-200 and the equivalent Chinese GB 3906 / GB 11022 series, with type tests at XIHARI and Hunan CEPRI. Low-voltage assemblies follow IEC 61439-1/-2 and GB 7251.1; the Schneider Electric BlokSeT, PrismaSeT and Prisma E builds and the ABB MDmax ST build also carry CE certificates from TÜV Rheinland. For North America, UL has issued Certificates of Compliance for MDmax-ST 4500 and MDrail E models (UL 891), MDrail-E-700 transfer switches (UL 1008) and industrial control panels (UL 508A); each covers only the models named on it.
What does Schneider Electric authorisation cover?
Schneider Electric (China) Co., Ltd. has authorised Hunan Zhenxiang Electric Co., Ltd. as a Technology and Business Partner for four systems: BlokSeT and PrismaSeT low-voltage switchboards, Prisma E low-voltage distribution and MVnex medium-voltage switchgear. The validity periods end in 2026, 2028, 2027 and 2027 respectively. The authorisation covers those systems only. It is not EcoXpert certification, it does not by itself certify a finished panel or guarantee regulatory approval, and warranty terms are agreed in your contract with Zhenxiang. Zhenxiang holds its own type-test and CE or IECEE CB certificates for each system.
What do the ABB authorisations cover?
ABB (China) Limited, Shanghai Branch has issued Hunan Zhenxiang Electric Co., Ltd. two certificates, both valid from 1 January to 31 December 2026: a Licensed Panel Builder certificate for MDmax ST Low Voltage Switchgear, under which ABB grants a licence to manufacture and assemble the licensed product, and a partner certificate for MDrail-E power distribution and control boxes/cabinets, under which Zhenxiang may integrate specified ABB products into the cabinets it builds. ABB authorisation does not by itself provide UL certification. UL certificates are issued by UL for the models named on each certificate, and warranty terms are agreed in your contract with Zhenxiang.
What lead time should I plan for?
A standard order of 100 panels ships in 30 days from approved drawings, covering design, procurement, fabrication, assembly, wiring and factory acceptance testing. Urgent orders of up to 50 panels can be delivered in 15 days. Larger orders scale in steps: 200 panels in 40 days, 300 in 50 days, 400 in 60 days.
Can you supply a complete data-centre electrical package?
Yes. Most data-centre orders bundle medium-voltage switchgear, transformers, generator output and paralleling boards, UPS input and output cabinets, variable-frequency drive panels for cooling plant, DPF01 row PDUs and the prefab power modules and distribution boxes used in modular halls. Since March 2023 Zhenxiang has delivered 175 such contracts across Malaysia, Thailand, Indonesia, Singapore, Hong Kong, Finland and China.
Do you offer factory acceptance testing and witness testing?
Assemblies are tested before dispatch. Routine tests include dielectric withstand, loop resistance, insulation resistance, earth continuity, IP probe checks and, for main switchboards, current injection at up to 2000 A. Customers and their consultants are welcome to witness the factory acceptance test before dispatch.
What after-sales support is available overseas?
A 7×24 service line answers within 15 minutes. Within China, site attendance is committed at 4, 2 or 1 hours depending on fault severity. For overseas projects, commissioning support, training and response times are agreed per contract; Zhenxiang service engineers are Schneider-trained distribution service partners.

Let's build what's next

Bring us your single-line diagram. We'll engineer the switchboard

Export enquiries are answered by an engineer in English within 24 hours; budgetary quotations follow within five working days.

Request a quotation WhatsApp