Selected contracts from 2022 to 2026. Data centres account for 175 of them; infrastructure, industry, energy and water make up the rest.

Data centres

175 contracts, seven countries

115contracts

Malaysia, Johor

KTP and NTP campuses, Plot 2 and Plot 4 substations, prefab power and generator modules, ByteDance "Falcon", K2 Data Centres JHR01, GDS and DayOne halls.

33contracts

China

Langfang, Beijing Daxing and Tongzhou, Tianjin, Shanghai Pujiang and Baoshan, Chengdu, Ulanqab HPC, Changshu, Suzhou.

27contracts

Thailand, Indonesia, Singapore, Hong Kong, Finland

CTP-A/B/C Bangkok, NDP-B/C Jakarta, SG1 Singapore, HK3 Hong Kong, two Finnish campuses.

The MEP contractor's electrical package

The MEP contractor's electrical package

  • Variable-frequency drive panels for chilled-water pumps, cooling towers and fan-wall modules
  • Diesel-generator output and paralleling switchboards, 16 to 18 sets per campus building
  • UPS input and output cabinets, ATS and static-switch boards
  • DPF01 row PDUs with branch metering, SNMP and Modbus
  • Distribution containers, fan-wall and cold-station containers, quick-plug cabinets and MEP box kits
  • KYN28 or MVnex substation switchgear, ring main units and transformers

Record

Selected contracts

ProjectSectorYear
GDS Malaysia, Indonesia and China campuses (Langfang, Tongzhou, Pujiang, Tianjin, Daxing)Data centre2023–2026
ByteDance "Falcon" data centre, Malaysia; ByteDance Pujiang, ShanghaiData centre2023–2025
DayOne NTP-H and NTP-Plot 4 prefab MEP, JohorData centre2025
K2 Data Centres JHR01, Johor: load-bank ATS cabinetsData centre2023
Johor KTP / NTP hyperscale campuses: VFD, generator boards, prefab modules, MV switchgear (115 contracts)Data centre2022–2026
Hong Kong HK3 data centre: MEP distribution boxesData centre2025
Singapore SG1: VFD cabinets and generator LV boardsData centre2025
Thailand CTP-A / B / C campuses: VFD, generator boards, quick-plug cabinetsData centre2025–2026
Indonesia NDP-B / C: VFD and generator boardsData centre2024–2025
Finland data centre: generator distribution and VFD boardsData centre2025–2026
Ulanqab HPC campus, Inner Mongolia: LV distributionData centre2024–2025
Langfang, Beijing Daxing, Tianjin, Shanghai Pujiang and Chengdu campusesData centre2023–2026
Qingdao New Airport 110 kV substation (MVnex)Infrastructure
Industrial Bank Pujiang building B: MEP switchgearFinance
Zhongyunxin and Tianjin Guofurui data centres: UPS and distributionData centre
Bosch Automotive (Changsha) and SEG Automotive phase 2: distributionAutomotive
Zoomlion Chongqing crane plant: intelligent manufacturing distributionManufacturing
China Resources Gaoshibei 100 MW wind farmRenewables
Weiqiao Aluminium 520 plant: 3 × 5.99 MWp and 2 × 7.5 MWp rooftop PVRenewables
Guangdong Energy Leibo wind farm 110 kV lineRenewables
Chaowei Power Changxing, Kaisheng Glass Bengbu, CNGR Advanced Materials: LV switchgearManufacturing2024–2025
Tibet Ngari, Nagqu and Shigatse smart-energy EPCInfrastructure
Hainan University drug-screening platform; Hainan Eco Software ParkBuildings2024
Shanghai International Auto City Tongji Science Park; Shanghai Smart Vehicle Software ParkBuildings2023–2024
Dongfeng Commercial Vehicle Shiyan PV; Chengfei industrial park plant 632Manufacturing2025
Tongfu Microelectronics Malaysia phase 3; WLCSP PenangSemiconductor2025
BYD Hungary plant: MV / LV switchgear and transformersManufacturing2025–2026
Bassiknou PV plant, MauritaniaRenewables2026
Nanxian 100 MW / 200 MWh energy storage: 35 kV switchgearEnergy storage2022
1.7 GW PV EPC, Inner Mongolia: primary equipmentRenewables2025
Shanghai Yangshupu waterworks: MV switchgearWater2024
Hefei North pumping station EPC: MV / LVWater2024
Boten–Mohan wastewater plant, Laos: electrical and automationWater2024
East Africa water plant: distribution boxesWater2025
CRRC Zhuzhou semiconductor: distribution cabinetsSemiconductor2025

Clients and end users

Selected clients and project references

Operators, EPC contractors and manufacturers who have specified Zhenxiang switchgear since 2022. Further references are available under NDA.

Each card names the project and the equipment supplied. A listing does not imply endorsement by the company named.

  • GDS Data centre Campuses in Malaysia, Indonesia and China, 2023–2026
  • ByteDance Data centre “Falcon” data centre, Malaysia; Pujiang, Shanghai, 2023–2025
  • DayOne Data centre NTP-H and NTP-Plot 4 prefab MEP, Johor, 2025
  • K2 Data Centres Data centre JHR01, Johor: load-bank ATS cabinets, 2023
  • BYD Manufacturing Hungary plant: MV / LV switchgear and transformers, 2025–2026
  • Bosch Automotive Bosch Automotive (Changsha): distribution
  • SEG Automotive Automotive Phase 2: distribution
  • Zoomlion Manufacturing Chongqing crane plant: intelligent manufacturing distribution
  • Industrial Bank Finance Pujiang building B: MEP switchgear
  • China Resources Power Renewables Gaoshibei 100 MW wind farm
  • Weiqiao Aluminium Renewables 520 plant rooftop PV: 3 × 5.99 MWp and 2 × 7.5 MWp
  • CRRC Semiconductor Zhuzhou semiconductor: distribution cabinets, 2025
View all referencesShow fewer
  • Guangdong Energy Renewables Leibo wind farm 110 kV line
  • Chaowei Power Manufacturing Changxing: LV switchgear, 2024–2025
  • Tongfu Microelectronics Semiconductor Malaysia phase 3, 2025
  • WLCSP Semiconductor Penang, 2025
  • CNGR Advanced Materials Manufacturing LV switchgear, 2024–2025
  • Dongfeng Commercial Vehicle Manufacturing Shiyan PV, 2025
  • Kaisheng Glass Manufacturing Bengbu: LV switchgear, 2024–2025
  • Chengfei Manufacturing Industrial park plant 632, 2025
  • Hainan University Buildings Drug-screening platform, 2024
  • Shanghai Chengtou Water Water and utilities
  • China Energy Engineering Project reference
  • PowerChina Project reference

Project examples

Data centres

Johor KTP and NTP hyperscale campuses

Equipment supplied
Variable-frequency drive panels, generator boards, prefab power modules and medium-voltage switchgear
Scope
115 contracts, 2022–2026

Manufacturing

BYD plant, Hungary

Equipment supplied
Medium- and low-voltage switchgear and transformers
Scope
4 contracts, 2025–2026

Infrastructure

Qingdao New Airport 110 kV substation

Equipment supplied
MVnex medium-voltage switchgear
Scope
110 kV substation

Planning a similar project?

Send the electrical schedule and we will return a budgetary package quotation.