About us

About Zhenxiang Electric

Zhenxiang Electric designs, manufactures and services medium- and low-voltage switchgear at its factory in Shaoshan, Hunan. Authorised by Schneider Electric and ABB for selected switchgear ranges, we supply data centres, industry and infrastructure in ten countries across four continents.

Est. 2022Shaoshan, Hunan factorySchneider Electric and ABB authorised221 team members
Zhenxiang Electric factory entrance, Shaoshan High-tech Zone, Hunan

Quality builds our brand Integrity shapes our future

Quality here is independently verified. The company holds ISO 9001, ISO 14001 and ISO 45001, a power-facility installation and test licence, Schneider Electric authorisation as a Technology and Business Partner for BlokSeT, PrismaSeT, Prisma E and MVnex, and ABB authorisation for the MDmax ST and MDrail-E ranges.

Schneider Electric also lists Zhenxiang as a Registered Power Services Partner for 2026, and its service engineers completed Schneider training on PIX and HVX switchgear, BlokSeT/Okken, Masterpact MT and RM6 in September 2025.

221
Engineers, technicians and staff
175
Data-centre contracts
6
Schneider Electric and ABB authorisations
10+
Export countries

Why Zhenxiang

Why choose Zhenxiang Electric?

Five key questions to ask your switchgear manufacturing partner.

Explore our answers and the supporting evidence below.

01

Can you meet my project specifications and support technical approval?

Engineering and specification support

Send a single-line diagram, load list or panel schedule. An engineer confirms voltage, short-circuit level, forms of separation and applicable standards, then returns general-arrangement drawings, busbar sizing and a bill of materials for approval.

Evidence Type-test reports and certificates (IEC 61439 and IEC 62271 test files, CE, UL, IECEE CB) are supplied with tender submissions on request. See certificates

02

Can you demonstrate consistent product quality?

Quality you can verify

Management systems are certified, product lines carry third-party type tests, and assemblies are tested before dispatch. Customers and consultants are welcome to witness the factory acceptance test.

Evidence ISO 9001, 14001 and 45001; CE (TÜV Rheinland), UL and IECEE CB certificates; routine tests listed under Manufacturing below.

03

Can you deliver to the agreed schedule?

Delivery you can plan around

Standard lead time is 30 days for 100 panels from approved drawings, and 15 days for urgent orders of up to 50 panels. Larger orders scale in steps up to 400 panels in 60 days.

Evidence 175 data-centre contracts delivered since March 2023, plus infrastructure, industrial and energy projects. See the project record

04

Can you adapt the equipment to my project?

Configured to your project

Equipment is configured from your single-line diagram and panel schedule rather than supplied as a fixed package, and the factory also builds PLC control panels for customers who need a tailored control solution.

Evidence Delivered examples: load-bank ATS cabinets (K2 Data Centres JHR01), quick-plug cabinets (Thailand CTP campuses), prefab power and generator modules (Johor), generator paralleling boards for 16 to 18 sets per campus building.

05

What support will I receive after delivery?

Support after delivery

A 7×24 service line answers within 15 minutes. In China, site attendance is committed at 4, 2 or 1 hours by fault severity. For overseas projects, commissioning support, training and response times are agreed in the contract.

Evidence Service engineers completed Schneider training in September 2025; the Registered Power Services Partner listing covers 2026. See response commitments

Authorisations

Technology Partners and Authorisations

Hunan Zhenxiang Electric Co., Ltd. holds separate authorisations from Schneider Electric and ABB, each with its own scope, title and validity period.

Manufacturer authorisation is separate from product certification. CE, IECEE CB and UL certificates are listed below by product range.

Schneider Electric

Technology and Business Partner

Issued by Schneider Electric (China) Co., Ltd. to Hunan Zhenxiang Electric Co., Ltd.

RangeScope named on the documentAuthorisation titleValid
BlokSeTBlokSeT Active Low Voltage SwitchboardTechnology and Business Partner1 Jan 2024 – 31 Dec 2026
PrismaSeTPrismaSeT Active Low Voltage SwitchboardTechnology and Business Partner1 Dec 2025 – 31 Dec 2028
Prisma EPrisma E Standardized low-voltage sub switchboardTechnology and Business Partner1 Mar 2025 – 31 Mar 2027
MVnexMVnex Intelligent Medium Voltage SwitchgearTechnology and Business Partner27 Apr 2024 – 26 Apr 2027

Also recognised by Schneider Electric: Registered Power Services Partner (authorised 1 Jan – 31 Dec 2026); Panel-builder Industry Pioneer Partner (2025); Prisma E Demonstration-level Partner. Service engineers completed Schneider training on 30 Aug – 2 Sep 2025.

ABB

Licensed Panel Builder (MDmax ST) and MDrail-E partner

Issued by ABB (China) Limited, Shanghai Branch, to Hunan Zhenxiang Electric Co., Ltd.

RangeScope named on the documentAuthorisation titleValid
MDmax STMDmax ST Low Voltage SwitchgearLicensed Panel Builder, certificate C2026-1059349-MDmax ST1 Jan 2026 – 31 Dec 2026
MDrail-EMDrail-E power distribution and control box/cabinetPower Distribution and Control Box/Cabinet Partner*, certificate C2026-1059349-MDrail-E1 Jan 2026 – 31 Dec 2026

MDmax ST: ABB has granted Zhenxiang a licence to manufacture and assemble the licensed product. MDrail-E: ABB certifies that Zhenxiang may integrate specified ABB products into the power distribution and control boxes/cabinets it builds.

* The MDrail-E certificate is issued in Chinese. The English title and scope shown here are a translation. Select a range name to view the ABB certificate.

What these authorisations mean

  • Schneider Electric has authorised Zhenxiang as a Technology and Business Partner for BlokSeT, PrismaSeT, Prisma E and MVnex
  • ABB has issued Zhenxiang a Licensed Panel Builder certificate for MDmax ST and a partner certificate for MDrail-E, each for the range and dates shown
  • Product certificates (CE, IECEE CB, UL) and type-test reports are separate documents held by Zhenxiang, each covering only the range or models it names

What they do not mean

  • Neither is EcoXpert certification or any other partnership level
  • ABB authorisation does not by itself provide UL certification. UL certificates are issued by UL for the models named on each certificate
  • No authorisation certifies a finished panel, guarantees regulatory approval, or makes Schneider Electric or ABB the warrantor of the equipment. Warranty and acceptance terms are agreed in your contract with Zhenxiang

Manufacturing

Manufacturing for your project

In-house fabrication, assembly and testing to meet your project requirements.

01

In-house fabrication

Enclosures, doors and mounting plates are cut, formed and finished in-house, so the metalwork is made under the same roof as assembly and testing.

Robotic bending for repeatable fabrication

Robotic bending for repeatable fabrication

Robot-assisted press-brake bending forms enclosure panels from stored programmes, supporting repeatable forming across multi-panel lineups and repeat orders.

02

Assembly and quality control

Busbar, wiring and assembly are carried out in-house, and the management system is certified to ISO 9001.

Copper busbar processed in-house

Copper busbar processed in-house

Busbar is punched, sheared and bent in-house on CNC machines, including a three-station processing centre, so busbar is made to the sizes your drawings call for.

03

Factory testing and delivery

Completed assemblies are tested against the agreed requirements before they leave the factory.

Tested before it leaves

Tested before it leaves

Routine tests cover the points below. Customers and consultants are welcome to witness the factory acceptance test before dispatch.

  • Dielectric withstand
  • Loop resistance and insulation resistance
  • Earth continuity
  • IP probe checks
  • Current injection at 1500 A and 2000 A for main switchboards

Standard lead times from approved drawings

100
panels
30 days
150
panels
35 days
200
panels
40 days
250
panels
45 days
300
panels
50 days
350
panels
55 days
400
panels
60 days

Urgent orders: 50 panels in 15 days.

Testing

Testing and Quality Control

Our in-house test equipment supports electrical testing and enclosure protection checks. Applicable tests and acceptance criteria are defined by the equipment and project requirements.

High-current testing

Two high-current test benches for current-injection testing. Bench capacity describes the test equipment, not the rating of any switchgear tested on it.

1500 A high-current test bench
1500 A high-current test bench High-current test bench, model KWJC-1500, used for current-injection testing.
2000 A high-current test bench
2000 A high-current test bench High-current test bench, model KWJC-2000, with voltage and current displays and start and stop controls.

Dielectric withstand testing

Power-frequency withstand test sets, floor-standing and portable, with the high-voltage test transformer that supplies the test voltage.

Power-frequency withstand test set
Power-frequency withstand test set Floor-standing control console, model KWJC-2, with a high-voltage test transformer.
Portable power-frequency withstand test unit
Portable power-frequency withstand test unit Portable control unit with analogue meters, used with a test transformer.
AC/DC high-voltage test transformer
AC/DC high-voltage test transformer Supplies the test voltage for the withstand test sets.

IP protection checks

A test probe for checking enclosure protection.

IP protection test probe
IP protection test probe Probe with a spherical head, used for IP protection checks on enclosures.

Applicable IP ratings and test methods follow the equipment specification.

Measurement and safety tools

Digital multimeter
Digital multimeter Handheld meter for electrical measurements.
High-voltage discharge rod
High-voltage discharge rod Insulated rod for safely discharging equipment after high-voltage testing.

Equipment photographed at the Shaoshan factory. Third-party type-test reports are listed separately. See certificates and type tests

Certifications

Certificates and type tests

Explore our management system certifications, product certifications and third-party type-test reports.

Each product certificate covers only the models named on it. Copies are available on request to support tender submissions.

CertificateScope
ISO 9001 / 14001 / 45001Quality, environmental and occupational health and safety management
CE · TÜV RheinlandLow Voltage Directive 2014/35/EU on BlokSeT, PrismaSeT, Prisma E, MNS, XL, XM, DPF01, MVnex-12 and MVnex-24
CE · TÜV Rheinland, ABB MDmax STLow Voltage Directive 2014/35/EU, registration AN 50711423 0001 (23 Jan 2026): type designation MDmax ST, main busbar 6300–4000 A
IECEE CBMVnex-12 and MVnex-24 metal-enclosed switchgear, 1250 A / 31.5 kA, IEC 62271-200
IECEE CB, ABB MDmax STCertificate HU-006195 (23 Jan 2026): low-voltage switchgear assembly, model MDmax ST, main busbar 6300–4000 A, IEC 61439-1 and -2:2020
UL 891 (US), ABB MDmax STUL Certificate of Compliance UL-US-2580957-0 (8 Sep 2025), WEVZ Switchboards, Dead-front, UL 891 Edition 12. Model covered: MDmax-ST 4500 only
UL 891 / CSA C22.2 No. 244 (Canada), ABB MDmax STUL Certificate of Compliance UL-CA-2559360-0 (8 Sep 2025), WEVZ7 Switchboards, Dead-front Certified for Canada. Model covered: MDmax-ST 4500 only
UL 891 (US), ABB MDrail-EUL Certificate of Compliance UL-US-2580986-0 (24 Sep 2025), WEVZ Switchboards, Dead-front. Models covered: MDrail E 40, 50, 80, 175, 350 and 600
UL 1008, ABB MDrail-EUL Certificate of Compliance UL-US-2578922-0 (23 Sep 2025), WPXT Automatic Transfer Switches for Use in Optional Standby Systems, UL 1008 Edition 9. Model covered: MDrail-E-700
UL 508AUL Certificate of Compliance UL-US-2587000-0 (29 Sep 2025), NITW Industrial Control Panels, UL 508A Edition 3. The certificate lists the model as “Industrial Control Panel”
CCCDPF01 and the domestic low-voltage range; GCK, GCS, MNS, GGD, GGJ, XM, XL, JP, BXD, GFBMX, DFX
Power facility licenceInstallation, repair and test of power facilities
XIHARI type testsKYN28-12 (to 4000 A / 40 kA), KYN61-40.5, VS1-12, ZN85-40.5, XGN / XGW / ZSV / GTXGN ring main units, ZW32 / ZW20, DFW, ZSF, XGN15
Transformer type testsSCB13, SCB18, S13-M, S22-M; energy-efficiency reports on SCB18 and S22-M

Service

Response commitments

Our dedicated teams support design and budgeting, production-stage witness testing, factory acceptance testing, commissioning and periodic inspections.

For projects in China, the fault-response commitments are set out below.

For overseas projects, service commitments, including commissioning support and training, are agreed in the contract.

Fault levelPhoneOn siteRepairDefinition
General15 min, 7×244 h12 hIntermittent or indirect effect on system function
Major15 min, 7×242 h8 hDirect effect on business with partial performance loss, or risk of outage
Critical15 min, 7×241 h4 hSevere degradation, fire, equipment damage or system shutdown

Our journey

Four years from founding to ten countries

  1. 2022

    Founded in Changsha

    Zhenxiang Electric is established on 14 March 2022, with its factory in Shaoshan High-tech Zone.

  2. 2023

    First data-centre contracts

    Deliveries begin in March 2023 and grow to 175 data-centre contracts by February 2026.

  3. 2024

    Schneider Electric authorisations

    Authorised by Schneider Electric as a Technology and Business Partner for BlokSeT in January and MVnex in April.

  4. 2025

    Prisma E and partner recognition

    Authorised for Prisma E in March and named a Schneider Panel-builder Industry Pioneer Partner.

  5. 2026

    PrismaSeT and ten export countries

    PrismaSeT authorisation runs from December 2025 and the ABB MDmax ST and MDrail-E authorisations from January 2026, with supply now reaching ten countries across four continents.

Need a budgetary quotation?

Send a single-line diagram or panel schedule. Export enquiries are answered in English within two working days.

Request a quotation